Tank installation, Coral Sakr St., Douar

Electro-mechanical works · Beirut, Lebanon

Fuel station equipment, tank lining and forecourt automation in Lebanon.

Apex Trading & Services supplies and installs fueling systems for Lebanon's retail fuel companies, from the lining inside the tank to the nozzle in the driver's hand.

+961 3 394 793

03 / 05Tank installation, Coral Sakr St., Douar

Clients include Lebanon's fuel retailers

TotalEnergies
Coral
MEDCO
Hypco
United Petroleum Company
Wardieh Holdings
MALAPCO

01Who we are

Electro-mechanical contractors to Lebanon's retail fuel companies since 1999.

Apex Trading & Services was established in 1999 in Beirut and is owned and managed by a group of Lebanese businessmen. The company specializes in electro-mechanical works and in supplying fueling equipment and systems to retail fuel marketing companies.

Apex represents major international fuel equipment and system manufacturers, and installs what it supplies: tanks, pumps, piping, gauging, dispensers and the automation that ties a station together.

Apex engineers and crew on site at Total Medawar

The crew on site · Total Medawar, 2013

Founded in Beirut
1999
Founded in Beirut
International manufacturers represented
5
International manufacturers represented
Station projects documented on site
8
Station projects documented on site
Quality procedures on every job
ISO 9002
Quality procedures on every job

02Forecourt anatomy

Everything above and below the forecourt, from one supplier.

Apex represents five international manufacturers and installs their equipment as one system. Select a point on the station to see what goes there.

GRADE ±0.00UNDERGROUND STORAGE TANK1234567

Point 05 · Tatsuno

Fuel dispenser

Sunny GII, XE and GL dispensers, or the ceiling-suspended SN-08. Apex was first in Lebanon to install them by lift.

See the Tatsuno range

Manufacturers represented

Wolftank · Tatsuno · Franklin Electric · Elaflex · Maser Italia

04Tank lining · Wolftank

Restore the tank. Keep the station open.

The greatest risk to a station's profitability lies unseen. Certified lining gives a corroding underground tank a new internal shell, without the civil works of digging it out.

Days

of tank downtime

against the 8-12 weeks often needed for full demolition and replacement

10-15 yr

international warranty

typically backing the Wolftank lining system

Fraction

of the capital cost

of civil works, tank removal and replacement

05On site

How a forecourt goes in, in our own photographs.

These are photographs from Apex jobs, not stock. Together they show the order a forecourt goes in, station after station.

  1. Tanks set
    01

    Tanks set

    Underground storage tanks are craned into the excavation, or existing tanks are opened up for certified lining.

  2. Pipe welded and tested
    02

    Pipe welded and tested

    Underground plastic pipe is joined by electrofusion, then the lines are pressure-tested on the gauge before backfill.

  3. Sumps, pumps and probes
    03

    Sumps, pumps and probes

    Tank sumps take the submersible pump and the gauging probe; dispenser sumps contain every connection.

  4. Dispensers commissioned
    04

    Dispensers commissioned

    Dispensers are lifted onto the islands, connected and handed over on a working forecourt.

07Three pillars

Quality, safety and continuous growth.

Quality

International ISO 9002 procedures behind every electro-mechanical solution.

Safety

Zero incidents as the goal on every site, for personnel, clients and assets.

Growth

The latest technology from Tatsuno, Wolftank and Franklin Fueling Systems.

09Contact

Let's talk about your station.

New build, tank lining, a dispenser upgrade or a gauging system: tell us what you are working on and the Beirut office will come back to you.

Working hours

Monday
9 AM – 5 PM
Tuesday
9 AM – 5 PM
Wednesday
9 AM – 5 PM
Thursday
9 AM – 5 PM
Friday
9 AM – 5 PM
Saturday
Closed
Sunday
Closed
Hi Dev